Solar PV & battery storage · Our speciality
Solar and batteries are what Max does best. Here's everything you need to know, a way to see it working through a day, and an honest estimate for your own roof.
A day with solar
Press play or drag through the hours. Then switch the battery off to see why it matters so much for evening bills.
12:00
Solar
3.18 kW
Home use
0.5 kW
Charging
1.5 kW
Exporting
1.2 kW
Midday peak. The battery is filling; anything left over is exported and paid for.
Illustrative sunny summer day for a typical 4 kWp home system. Winter output is lower; your survey models your actual roof and usage.

Battery storage
A battery stores the solar you don't use at midday, so it can run your home when prices peak. Neat, quiet and sized to your usage after survey.
Your roof, your numbers
Answer what you can. Every "Not sure" uses a typical value and lowers the confidence, so the result is always honest about what it knows.
Your illustrative estimate
4.3 kWp system
Confidence: Low · 8 answers assumed
| Lower | Likely | Higher | |
|---|---|---|---|
| Yearly generation | 2,842 kWh | 3,229 kWh | 3,488 kWh |
| Used in your home | 63% | 63% | 63% |
| Bill saving per year | £471 | £535 | £578 |
| Export income per year | £126 | £143 | £155 |
How this is worked out: panels × 0.43 kWp × regional yield × roof direction × shading. Self-use depends on daytime occupancy and battery. Using 26.32p/kWh import and 12p/kWh export.
No installed price or payback is shown: every system is designed and priced after survey and data capture, with zero-upfront options available where eligible. Method MAX-SOLAR-2026.2.
What people really ask
Built for every scale
Cut bills, store your own power and add backup or EV charging when you're ready.
Ask MaxDaytime demand matches solar output, so more is used on site. No price cap on business energy makes it even more valuable.
Compare funding routesLower tenants' bills, improve EPC ratings and plan roll-outs across whole portfolios.
Portfolio financeLarge roofs and ground-mount arrays can power operations and earn from export or private wire.
Talk to the teamWays to pay
We don't publish a headline price, because the right system depends on your roof, usage and goals. After survey and data capture, Max secures the best possible cost and shows every route side by side.
Own the system and keep every saving and export payment from day one.
Spread the cost; in many cases monthly payments can sit close to the bill savings.
A funded route where Max secures the investment and ownership can transfer to you after repayment, subject to approved terms.
No upfront cost. You pay a lower agreed rate for the solar power you use, subject to assessment and terms.
The Hybrid HP model
Hybrid HP is Max's funded route for solar and battery systems. We aim to fund or secure funding for the full project cost on your behalf. You keep the energy savings from day one, and ownership of the system can transfer to you once repayment completes, subject to assessment, eligibility, approval and agreed terms.
The project is funded, so your capital stays where it is. Payments are designed to sit alongside your bill savings, not on top of them.
Unlike a PPA, where the funder owns the system and sells you the power, Hybrid HP is structured so the system becomes yours after the agreed term.
We model Hybrid HP against the Hybrid PPA route with your own figures, so you can see ownership, obligations and end position clearly.
Worked example · Amporah x Max Energy 24/7 model
250 kWp solar, 100 kW / 200 kWh battery and Gateway Pro. About 210,000 kWh used on site at 22p avoided grid rate, worth around £46,200 a year. Under a PPA the hotel pays 15p to 18p per solar kWh for 20 to 25 years and never owns it.
7 year Hybrid HP
£59,542 a year, then the hotel owns the system
10 year Hybrid HP
£46,199 a year, then the hotel owns the system
Based on a £310,000 planning cost at an illustrative 8% a year, annual instalments, no inflation or degradation. Illustrative commercial model dated 29 September 2026, not a quotation, offer or guarantee. Cost, rate and trading income are confirmed by survey and the finance provider.
Illustrative model · MAX-FUND-2026.2
Enter figures from bills or a design proposal. No personalised result appears until the five essential figures are supplied.
Import use, generation, import rate, PPA rate and project cost are needed before Max can compare scenarios responsibly.
The facts, with sources
0% VAT on solar panels and batteries installed in homes in Great Britain, until 31 March 2027.
HMRC VAT Notice 708/6, checked September 2026Smart Export Guarantee: licensed suppliers with 150,000+ customers must offer a payment for exported electricity.
Ofgem SEG, checked September 2026Rooftop solar on houses is usually permitted development in England, with limits for listed buildings and conservation areas.
Planning Portal, checked September 2026An MCS-certified installation and installer is required to claim the Smart Export Guarantee.
MCS, checked September 2026
After survey
Survey, design, MCS installation and commissioning, then a secure GridSync link to your building's model with generation and battery data layers, plus ongoing monitoring.
Start with Max or speak straight to a solar specialist.